Contractors on the Site

From 1 January 2021, every contractor used by a tenant on the Perth Markets Site must be registered with PMG. 

Contractor registration

A tenant wishing to register or check to see if the contractor they intend on using is registered can email the contractor details to PMG and we will check their status on the contractor management system. If needed, PMG will contact the contractor with the process for registration.

Contractors must complete the details and upload relevant insurances/licences etc into the contractor management system. A link to this system is sent by PMG to the nominated person at the company wishing to register for access to carry out works on site. Once the company is approved they will be able to send the site induction to their staff. Any contractor attending site will need to have carried out the induction to gain access to site.

Contractor access to Site

All contractors must sign in and out at the PMG Reception between 7:00am and 5pm, Monday to Friday, or at the Gatehouse outside of these hours.

Registered and approved contractors will then be given keys and access cards for the Site. These must be returned at the end of the job.

Registered and approved contractors will be able to sign out keys and access cards for the Site. These must be returned each day and should never be removed from the Site. If you are leaving the Site, the key or access card must be returned. Failure to return keys can incur significant cost to the contractor.

Permits

Prior to engaging in works on site, a signed permit or written permission must be obtained from Perth Markets Group Limited.

Permits are required for the following tasks:

  • Hot work
  • Working in confined spaces
  • Working in isolation
  • Using high access equipment
  • Access to roof areas
  • On-site excavation
  • Penetration of fire walls and floors
  • Access to high voltage areas
  • Gas, water and electrical isolation
  • Equipment use on site
  • Fire system isolation or impairment

To apply for a permit, please visit the PMG Reception in office hours. Alternatively, you can contact us to request a copy be emailed to you.

Applications should be made at least 24 hours in advance unless it is an emergency.

Please note, contractors may not be allowed on the Site if permits are not in place or if they are not registered with PMG.